Opens in a new tab

P&T Metals is a family-owned business located in Southern California, servicing businesses and industries for 58+ years.

December 15, 2025

California’s New Metal Shredding Rules Hit Hard

California passed two new laws that change how metal shredding plants operate. SB 404 wants permits from DTSC. AB 2851 requires air monitoring. Both laws have strict deadlines starting in 2027.

This article explains the new rules, when deadlines hit, and who needs to comply. We cover what changed and what it means for California operators.

Most scrap yards won’t be affected. These rules only apply to plants with hammer mills that shred cars and appliances. About 9 facilities in California fit that description. If you crush, bale, or shear metals, you’re probably fine.

Let’s break down who these rules actually affect.

Key Takeaways

California operators need to know if new metal shredding rules apply to their facilities. These changes only affect specific operations.

What this covers:

  • Which facilities need permits under California law
  • SB 404 and AB 2851 compliance deadlines
  • Why most scrap yards are excluded
  • What the new rules require

Who These Rules Actually Affect

Most scrap recycling operations don’t need these permits. Only plants with hammer mills that shred cars and appliances qualify.

California defines a metal shredding facility as any operation that uses a shredder to process vehicles, appliances, and scrap metal. The key word is “shredder” or “hammer mill.”

The law excludes crushers, balers, shears, and feeder yards. According to DTSC documentation, most scrap metal operations don’t fall under metal shredding rules.

Who’s affected:

Your Facility TypeDo New Rules Apply?
Hammer mill that shreds cars/appliancesYES
Metal crusherNO
Metal balerNO
Metal shearNO
Feeder yardNO
Standard scrap yardNO

California has 9 metal shredding facilities. They’re in Oakland, Redwood City, Anaheim, Bakersfield, Colton, San Pedro, Lancaster, and Stockton.

If you run a standard industrial scrap management operation, you’re likely not affected. The difference matters because compliance costs are high for shredding plants.

SB 404: New Permit Rules

SB 404 passed the Legislature in September 2025. The Governor vetoed it in October 2025. The Senate may override the veto.

If it becomes law, all metal shredding facilities need DTSC permits. Plants would submit paperwork within 30 days, then full applications within six months.

What SB 404 requires:

Facilities must describe how they operate. They need plans for waste management. They must show how they prevent bad materials from entering shredders.

Before applying, operators hold a public meeting. The community gets 30 days notice.

KEY DEADLINES (If SB 404 Becomes Law)

30 days: Submit notice of intent

6 months: Submit full application

Before applying: Hold public meeting

Permit length: 10 years

Permits last 10 years. DTSC visits each facility after getting applications. The full text of SB 404 is available on the California Legislature website.

Applications need lots of paperwork. Training plans. Inspection schedules. Water testing procedures. Closure cost estimates. Financial proof you can close the facility properly.

AB 2851: Air Monitoring Requirements

AB 2851 became law in 2024. It requires air quality monitoring at metal shredding facilities.

Local air districts develop monitoring rules by January 1, 2027. They work with DTSC and health officials to set limits for air pollution.

Districts adopt regulations by July 1, 2027. The rules say what gets monitored, how often, and what levels are too high.

What AB 2851 covers:

  • Air monitoring systems at facility borders
  • Testing for hazardous materials
  • Collection of dust and fibers
  • Reports to health departments
  • Community notification when problems occur

DTSC creates notification rules by July 1, 2027. These rules explain how facilities tell nearby residents about air quality.

Metal shredding facilities pay fees to cover monitoring costs. You can read AB 2851 full text on the state website.

Why California Created These Rules

A major fire at Radius Recycling in Oakland happened in August 2023. Oakland firefighters found a burning pile the size of a football field, up to 70 feet high.

DTSC tested air around the West Oakland facility from December 2020 to May 2023. Tests showed the facility likely caused higher levels of lead and nickel in the air.

What happened before:

In the late 1980s, state officials gave seven shredding facilities special letters. These “F letters” let them avoid stricter hazardous waste rules if they treated materials certain ways.

The Bay Area Air Quality Management District released a white paper in July 2024 about metal recycling. It covered problems with current rules and suggested fixes.

Community groups complained about bad air, fire risks, and pollution. They wanted better oversight of facilities in their neighborhoods.

Tests showed shredder waste often has high levels of lead, cadmium, copper, and zinc. The waste includes glass, rubber, car fluids, dirt, and plastics left after metals are removed.

What Permit Applications Need

If SB 404 passes, applications need detailed plans. The rules look like hazardous waste facility permits.

What’s RequiredDetails
Facility overviewComplete description of site and operations
Processing methodsHow materials get shredded and separated
Waste handlingHow leftover materials get treated
Safety controlsWays to stop bad materials from entering
Training plansHow staff learn proper procedures
Inspection scheduleRegular check-up protocols
Water testingProcedures to prevent runoff problems
ReportsDocumentation and filing schedules
Closure planningCost estimates for shutting down
Financial proofMoney set aside for proper closure

Plants must explain how they control dust and fibers. This includes sweeping, water trucks, sprinklers, and fences.

Facilities keep written logs of all cleaning. Logs stay on file for inspections.

Within one year, operators do safety assessments. They look for any material releases that threaten health or environment.

Reports must be signed by owners. False statements carry criminal penalties.

DTSC Gets Enforcement Power

DTSC runs enforcement if SB 404 becomes law. The department inspects each facility yearly.

After getting applications, DTSC visits facilities. The department posts information about each facility online.

What DTSC can do:

Plants must tell DTSC right away about fires or incidents needing fire department help. They tell nearby communities when fires or incidents threaten health outside facility boundaries.

DTSC can cancel permits for violations. The department sends violations to prosecutors. Within 15 days of finding illegal disposal, DTSC tells local health officials.

Other agencies keep their authority. Air districts, water boards, and local health departments still enforce their own rules.

Owners can appeal permit decisions. Before appealing, they must meet with DTSC to try fixing problems.

What This Means for Most Scrap Yards

Here’s the key point: these rules target shredding operations, not regular scrap recycling. If you don’t use hammer mills to shred cars and appliances, you’re likely not affected.

Manufacturing facilities that make scrap don’t fall under these rules. Feeder yards that collect and sort metals are excluded.

Standard yards that crush, bale, or shear metals keep operating under current rules. New permit and monitoring requirements apply only to the 9 California facilities that do actual shredding.

For affected facilities, compliance costs are high. Applications need lots of documentation. Monitoring systems cost money to install and maintain.

Operators should know their facility’s classification. If you’re unsure whether you do metal shredding, ask DTSC before rules take effect.

Other environmental and safety rules still apply. Air quality laws, water rules, and hazardous waste regulations for any materials you generate haven’t changed.

Important Deadlines

AB 2851 deadlines are set because the law passed. SB 404 deadlines depend on whether the Legislature overrides the veto.

DateWhat HappensWhich Law
January 1, 2027Air districts develop monitoring rulesAB 2851
July 1, 2027Districts adopt monitoring regulationsAB 2851
July 1, 2027DTSC creates notification proceduresAB 2851
TBDSubmit notice of intent (30 days after)SB 404 if enacted
TBDSubmit application (6 months after)SB 404 if enacted

The Legislature decides whether to override the Governor’s veto. If they do, SB 404 becomes law and triggers the 30-day and 6-month deadlines.

Facilities should watch the legislative process. Override needs a two-thirds vote in the Senate.

How This Affects Recycling

Metal shredding facilities process millions of tons of old cars, appliances, and metal items yearly in California.

Without recycling, these materials would fill landfills. During recent Los Angeles fires, facilities processed hundreds of burned vehicles.

Recovered metal becomes product for manufacturing. Steel plants, smelters, and foundries buy the materials to make new products.

The industry says rules must balance environmental protection with staying in business. Some facilities have operated since the 1980s and 1990s. Clear rules help both regulators and operators.

Community groups say neighborhoods have dealt with hazardous waste, fires, and bad air and water for decades. They wanted comprehensive oversight instead of case-by-case enforcement.

California’s trying to create the same standards for all metal shredding facilities statewide. Clear rules help regulators enforce requirements consistently.

The regulations recognize that metal shredding helps the circular economy while requiring facilities to meet environmental and safety standards that protect nearby communities.

Bottom Line

California metal shredding regulations changed with AB 2851 and proposed SB 404. AB 2851 requires air monitoring starting in 2027. SB 404 would require permits if the Legislature overrides the veto.

The most important part: these rules only apply to facilities with hammer mills that shred cars and appliances. Standard scrap yards, crushers, balers, and shears are NOT affected.

About 9 California facilities meet the legal definition. They face deadlines, permit applications, monitoring requirements, and ongoing reports.

Knowing whether your facility does metal shredding determines if these rules apply. The definition matters because compliance costs differ a lot from regular scrap recycling rules.

Affected facilities should prepare for monitoring requirements by 2027 and watch for SB 404 updates.

Keep Your Facility Compliant

California’s recycling regulations keep changing. Knowing which rules apply to your facility helps you stay compliant and avoid penalties.

Standard scrap operations that don’t do metal shredding should verify their classification. Good records show regulators your operations aren’t metal shredding facilities.

For facilities that do shredding, preparing now for permits and monitoring prevents rushing when deadlines hit. Certified destruction and compliance records become more important under stricter oversight.

Contact us at (626) 443-8921 to talk about your California compliance needs. We can help you understand which regulations apply to your operations and what records you need.

Need to sell your scrap?

We buy and process all metals at our South El Monte facility. Competitive payouts, fast turnaround, no hassle. Stop by or reach out to our team today.

Kurt Rexius

Owner
Kurt Rexius is the second-generation owner of P&T Metals in South El Monte, California. With decades of hands-on experience in metal buying, processing, and industrial scrap management, he oversees one of Southern California's few direct mill and foundry suppliers since 1968.